Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2448.7
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Mar 14, 2020     8-11 Step 1-3 HS Riveting Inspar ribs - (1.5 hours)       Category: Tail Feathers
assembled inspar ribs to Stringer web assembly.
Rivet inspar ribs to the structure using pneumatic squeezer
inserted snap busing into 5/8"" holes
Manufactured Head of rivets OUTSIDE in order to have easier drill-out option in necessary as indicated in MIL-R-47196A(MI) (3.3.3.1 Head direction. Unless specified on the engineering drawing or specification, the manufactured head of the rivet shall be located on exterior surfaces.)


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.